Remove Array
article thumbnail

AEP OnSite Partners signs LOI to develop solar field to power cryptocurrency mining

Renewable Energy World

Sangha Systems, developers of an 82-MW cryptocurrency mining facility at a former steel mill in Hennepin, Illinois announced that it has signed a letter of intent (LOI) with AEP OnSite Partners to develop a 2 – 5-MW behind-the-meter solar power array to begin to migrate its electricity consumption towards clean energy.

article thumbnail

How Shell Is Selling the Petrochemical Buildout as ‘Sustainable’

DeSmogBlog

If you take Shell’s word for it, the oil giant’s growing petrochemical operations are indicative of its “commitment” to a cleaner energy future. Today, a peculiar sign still greets those who enter the town: residential homes are pictured next to an oil tank, surrounded by refinery towers, all basking together underneath the sun and blue sky.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Isle de Jean Charles Community Members Moved into the First Federally Funded Resettlement Project in Louisiana Despite Visible Engineering Issues

DeSmogBlog

Standing water under new construction can signal subsidence, which can lead to structural issues, and the water also presents a breeding ground for mosquitoes. Naquin shared with me that he had no desire to be present for the first move-ins, when I met him at the site on August 24. But the state scrapped these plans.

article thumbnail

What Is B Corp? B Corp Certification Guide + Quick Assessment

Green Business Bureau

Creating better businesses with B Corp Certification and beyond B Corp Certification presents a set of guiding principles that support organizations to minimize their impact on the environment and society. The minimum wage is not enough to meet the basic needs of employees – to cover housing, energy, food, and childcare costs.

article thumbnail

Where Does All The Radioactive Fracking Waste Go?

DeSmogBlog

And since 1997 about one million barrels worth of oilfield waste has been brought to Lotus’s disposal site, situated off a dusty desert road located 19 miles west of Andrews, Texas (and just several miles from a massive solar array financed by Facebook and which provides energy to Shell’s fracking operations).

Waste 98