Remove Building Energy Monitoring Remove Construction Remove Natural gas Remove Seafood
article thumbnail

A Push to Expedite Permits Fueled by Disaster Capitalism Threatens to Fastrack the Climate Crisis

DeSmogBlog

Walker explained in an email that they were “required to limit the number of attendees to maintain safety protocols on an active construction site.” I saw a few construction vehicles that served as a backdrop to the makeshift stage where speakers, including Louisiana’s Gov.

article thumbnail

Louisiana Communities Already Vulnerable to the Climate Crisis Worry That the Expansion of the LNG Export Industry Could Be Catastrophic

DeSmogBlog

They live in Plaquemines Parish a few hundred feet from a massive liquified natural gas (LNG) export terminal being built by Venture Global and the Gator Express pipeline, which will transport natural gas under high pressure to the facility. Many were without power for over a week.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Online Event - VERGE Energy Conference

Green Market Oracle

VERGE Energy Conference (VERGE 20) will take place on October 26-30, 2020. This online event can be attended from anywhere, The central theme at VERGE 20 will focus on how energy systems can be decarbonized, decentralized, digitized and democratized. Climate change is the most significant global threat we face today.

article thumbnail

The Uncertain Future of Gas Exports on Louisiana’s Vanishing Coastline

DeSmogBlog

The power lines had been replaced four times in the past two decades. “It Allaire spent more than three decades as an environmental engineer in the oil industry, working for Amoco and then BP, after the two companies merged in the late 1990s. Department of Energy (DOE) revises its review process. “I had a house right over here.

article thumbnail

? H2 hubba, hubba #170

Climate Tech VC

Deals of the Week (10/8-10/15) Venture Fundings 🔋 Skeleton Technologies , a Tallinn, Estonia-based graphene-based supercapacitor and battery energy storage developer, raised $113M in Corporate funding from Siemens Financial Services and Marubeni.  💼 Find or share roles on our job board here.