Remove 2030 Remove Cooling Remove Polyphase Energy Monitor Remove Solar Energy Monitor
article thumbnail

Smith College, MA embarks on $220-million geothermal project

ThinkGeoEnergy

The geothermal project is expected to be completed by 2028, towards achieving carbon neutrality by 2030. With the project, the Smith College aims to fully move away from fossil fuels for the heating and cooling systems of the campus. A series of wells at a depth of 800 feet (~243 meters) will be drilled and connected in a closed loop.