Remove 2030 Remove Cooling Remove Energy Monitor Remove Polyphase Energy Monitor
article thumbnail

Smith College, MA embarks on $220-million geothermal project

ThinkGeoEnergy

The geothermal project is expected to be completed by 2028, towards achieving carbon neutrality by 2030. With the project, the Smith College aims to fully move away from fossil fuels for the heating and cooling systems of the campus. A series of wells at a depth of 800 feet (~243 meters) will be drilled and connected in a closed loop.

article thumbnail

ABB charges into the future with Formula E

Charged

The global electric racing championship Formula E has been a huge success by any measure. Automakers like Mercedes-Benz, Porsche, Nissan, and Jaguar have embraced the series, which is surely the world’s most prominent showcase for electric vehicle performance. You need to manage your energy in order to be efficient.