article thumbnail

US May Host First Factory for Siemens Gamesa’s 14MW Offshore Turbine

GreenTechMedia

after confirming on Tuesday that it will supply that model to Dominion Energy’s Coastal Virginia Offshore Wind project. waters, with targeted installation over the course of three phases in 2024-2026. lacks a local supply chain in an industry reliant on huge, expensive-to-transport components. Dominion’s 2.6-gigawatt

article thumbnail

Carbon Mapper Launches Satellite Program to Pinpoint Methane and CO2 Super Emitters

Planet Pulse

Our mission is to help fill gaps in the emerging global ecosystem of methane and CO 2 monitoring systems by delivering data that’s timely, actionable and accessible for science-based decision making.” Carbon Mapper, in collaboration with its public and private partners, is developing the satellite constellation in three phases.

Methane 128
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Battery-integrated chargers offer a cure for America’s weak electric infrastructure

Charged

Furthermore, the company draws a distinction between a battery-buffered solution, which needs the grid to operate, and a battery-integrated solution, which can operate on its own, and can be made bidirectional to send energy back to the grid in times of need. A battery-buffered system is just taking energy from the grid.

article thumbnail

Emporia’s energy management system prepares for the bidirectional EV charging future

Charged

Total control of power usage: from solar to EV and back to the house. Once an EV can double as a stationary storage device, it will take its place as part of an energy ecosystem that includes rooftop solar and energy management—and could even become a source of revenue for owners and a valuable grid-balancing resource for utilities.