SEF Weekly: German interconnector, bp R&D and heat network retrofitting
Smart Energy International
AUGUST 5, 2022
According to the technology solutions provider, the interconnection will be provided to the two German TSOs to reduce fossil fuel consumption and assist with their carbon neutrality goals. The existing heat network serves phases 1 and 2 of the development and was originally built between 2000 and 2009.
Let's personalize your content