Setting the stage for Taiwan’s geothermal sector at the TIGC 2024
ThinkGeoEnergy
FEBRUARY 22, 2024
The 2nd Taiwan International Geothermal Conference was held 20-21 February 2024 at the premises of the Taiwan CPC Corporation in Taipei, Taiwan. The Minister also stated Taiwan’s ambitious goals of building 20 MW of installed geothermal power capacity by 2025 and scaling this up to 200 MW by 2030 and 2 GW by 2040.
Let's personalize your content