First-of-its-kind electric truck charging facility at Port of Long Beach: a case study (Webinar)

What it takes to bring charging infrastructure online and planning for the future.

The WattEV Port of Long Beach charging depot is the first-of-its-kind charging facility focused exclusively on electric heavy-duty trucks. The site is currently operating under its first phase with the ability to charge 26 trucks concurrently with 5 MW of capacity delivered by Southern California Edison.

The full phase of the site will include an additional 7 MW of power serving additional CCS stalls along with MCS pass-through lanes.

Join this webinar at the Virtual Conference on EV Infrastructure, where we will walk through all stages of the site from start to finish to explain what it takes to get a heavy-duty truck charging depot online and how to plan for the future.

Reserve your spot—it’s free!


See the full session list for the December Virtual Conference here.

Broadcast live on December 4-6, 2023. This virtual event will span all things EV charging in two main tracks:

  • Track 1: Deploying EV Infrastructure & Fleets
    Content for fleet/facility managers, charging network operators, public transport planners, etc.
  • Track 2: Design & Manufacturing of Charging Systems
    Content for engineers who are building, testing, and manufacturing charging systems.

The free-to-attend conference will feature live presentations, interactive Q&As, on-demand webinars, and whitepaper downloads. All live webcast sessions are free to attend and will be recorded and available to watch on-demand after the event. Register to reserve your spot to watch it live or on-demand.

Comment
Create Account. Already Registered? Log In

Virtual Conference on EV Engineering: Free to Attend

Don't miss our next Virtual Conference on April 15-18, 2024. Register for the free webinar sessions below and reserve your spot to watch them live or on-demand.

LOAD MORE SESSIONS

Webinars & Whitepapers

EV Tech Explained